Plans are available at: Plans and Specifications may be viewed, without charge, on the Materials Management Division website http://www.mmd.admin.state.mn.us/solicitations.htm, then click on Virtual Plan Room – Construction Contracts. Plans and specifications can be downloaded for a non-refundable charge of $10.00. Please contact QuestCDN.com at 952-233-1632 or info@questcdn.com for assistance in downloading and working with this digital project information. Plans are also available at the Minneapolis Builders Exchange website: http://www.mbex.org/ .
Project Description: The project is a major renovation and remodeling of the existing Minnesota Army National Guard Cedar Street Armory building located at 600 Cedar Street in St. Paul, Minnesota. The project will include all new plumbing, fire protection, HVAC, electrical, interior walls, doors, and finishes, elevator and accessibility upgrades, and exterior improvements including window and entrance repair and replacement. The renovation and remodeling will also include an infill addition of 7,000 square feet of new second floor and 3,000 square feet of third floor space within the existing Drill Hall building volume
Scope of Work includes: Selective Structure Demolition, Cast-in-Place Concrete, Unit Masonry, Structural Steel Framing, Composite Metal Decking, Metal Fabrications, Wood Blocking, Interior Architectural Woodwork, Glass Fiber Reinforced Panels, Cold Fluid Applied Waterproofing, Thermal Insulation, Exterior Insulation and Finish Systems, Weather Barriers, Metal Insulated Infill Panels, Built-Up Asphalt Roofing, Sheet Metal Flashing and Trim, Cementitious Fireproofing, Firestopping, Joint Sealants, Joint Sealant Schedule, Expansion Joint Cover Assemblies, Door Hardware Schedule, Hollow Metal Doors and Frames, Flush Wood Doors, Access Doors and Frames, Overhead Coiling Doors, Vault Doors, Aluminum Entrance, Windows, and Curtain Wall, Bullet Resistant Sliding Transaction Window, Door Hardware, Low-Energy Automatic Door Operators, Key Storage Equipment, Glazing, Gypsum Board Assemblies, Tiling, Acoustical Ceilings, Resilient Flooring, Resinous Flooring, Carpeting, Wall Coverings, Painting, Toilet Compartments, Wire Mesh Partitions, Demountable Partitions, Operable Partitions, Toilet and Bath Accessories, Fire Extinguisher Cabinets, Metal Lockers, Food Service Equipment, Horizontal Louver Blinds, Hydraulic Elevators, Excavation and Fill, Helical Piers, Asphalt Paving, Concrete Paving, Chain Link Fences and Gates, Utilities, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Electronic Safety and Security
Completion: Substantial Completion no later than 365 calendar days from and including the date of: the provisional notification to proceed (if one is issued), or (if a provisional notification to proceed is not issued) the date of the final notification to proceed